Processes | Clinical | Perfect Scheduled Attendance

Perfect Scheduled Attendance
This process compares the distribution of study visit days for each center compared to all other centers combined, and identifies unusual differences. For example, a site where all visits occur on the same study day can be flagged for further investigation.
What do I need?
This process requires:
SV: One of SVSTDTC or SVSTDY, and VISITNUM. (VISIT is used if available.)
If using SVSTDTC, RFSTDTC is required in DM.
DM requires ARM and SITEID.
Refer to Localization-Specific Value Specification for more information.
Output/Results
The output generated by this process is summarized in a tabbed report. Refer to the Perfect Scheduled Attendance output documentation for detailed descriptions and guides to interpreting your results.